Week 60
July 16 - 22, 2000
7/16/00 --
Only 10 days until Oshkosh
Reassembled the aircraft. Began working on the motor mounts.
7/17/00 Worked on the motor mounts. Fitted the cowl around the engine.
Performed a weight and balance to determine engine placement.
7/18/00 Routed some of the fuel line and installed the flop tube and fittings into
the fuel tank.
7/19/00
7/20/00
7/21/00 Mounted all of the electrical components (battery, switches, relay,
rectifier, and control box.)
7/22/00 Began moving everything to the airport. Reassembled the
aircraft. Special thanks goes out to all those
that helped including Dave, Chris, Joe, and Phillip. The electrical work was completed by Chris.
Riveted the ailerons, elevator, and rudder to the wings and tail respectively.
|





|